If you're building a home in Jamaica from the US, you're trusting people to make good decisions in a room you're

not standing in. A portfolio shows you how a finished house can look. It can't show you what happens on a Tuesday in Negril when a door doesn't fit its opening and you're at work in another country.

So before you sign with an architect, a builder, or a designer, ask these seven questions. They're the same ones I'd want you to ask us. The answers will tell you how your project will run when you're not there, whether you're building in Negril, Montego Bay, or anywhere in between.

Why hiring for a Jamaica build is different

I've spent over 25 years in design, and I work between Los Angeles and Jamaica. A renovation in Los Angeles and a new home build in Negril follow different rules. Materials that ship overnight at home can sit in customs for weeks. Trades you'd call on a Tuesday and see on a Wednesday might be booked out for a season.

None of that means your build has to go sideways. It does mean the usual questions about style, budget, and past projects won't tell you enough. These seven are about what happens between your visits.


1. Who will be on site when I'm not, and who do they report to?

Start here, because every other answer depends on this one. You want a name, and you want to know whether that person works for you or for the contractor.

Your general contractor's job is to build. Checking that work on your behalf is a separate job. When someone on the ground reports to you, you hear about a wall that isn't square directly, and early.

Ask how much time that person actually spends on the island, too. If a contractor goes quiet for ten days, you need someone nearby who can tell you whether that's normal or a problem.

A good answer sounds like: a real name, a clear role, and a direct line back to you.


2. How often will someone walk the site, and what will I get afterward?

Ask for the actual schedule. We walk the site on a set schedule, and every visit turns into photos, video, and a written update you can read in a few minutes. On the homes we're managing now, that documentation goes out every two weeks.

Regular visits catch small things while they're still small: a slider's drain slope that needs correcting, or tile that needs protecting before the next trade comes through.

Then ask to see a real update from a current project. You'll learn more from one sample report than from a long conversation about communication. Ask how you'd hear about a problem between visits as well, so you're never finding out three weeks after it happened.

A good answer sounds like: a set schedule, a sample report, and no need to chase anyone for news.


3. What has to be ordered first on a Jamaica build, and when?

In Los Angeles, a tile delay costs you a few days. In Jamaica, the order you buy things in can set your whole schedule. Windows, doors, stone, tile, and fixtures come in from off the island, and they have to clear customs before anyone can install them.

If your bronze windows aren't on site when framing is done, your GC waits, and the schedule slides with it.

We buy backwards. We start from the install date and work back, so the longest-lead pieces get chosen and ordered first, sometimes months before the walls go up. Ask anyone you're considering to walk you through how they plan purchasing on an island build, and how those deliveries line up with the trades who are booked to install them.

A good answer sounds like: specific items, in a specific order, tied to your construction schedule.


4. Who handles shipping and customs?

This is the question I'd push hardest on, because most designers never touch this part of a project. Ask who places the orders, who tracks each shipment, and who deals with customs when something is held up.

Ask how you'll know where a piece is, too. We handle trade-only ordering, shipping, and customs coordination ourselves, so you know where each piece is without chasing anyone.

If the answer is that the owner usually arranges it, that's useful to know now. It means that part of the job is yours.

A good answer sounds like: one person responsible for every shipment, from the vendor to your site.


5. Who is accountable when something goes wrong?

Every build has problems. What you want to know is who picks up the phone.

If your designer, architect, GC, and procurement source are four unconnected parties, delays become nobody's fault and everybody's excuse. You end up as the project manager by default, from a different country, without the local relationships to move things along.

Ask how the person you're hiring works with your architect and builder. We work alongside them, not in place of them, with one person accountable to you from concept through installation.

A good answer sounds like: one name, for the whole project.


6. What have you built in Jamaica, and what did you choose for salt air?

Ask to see work on the island, and ask what was different about it. A designer or builder who has done it will talk about materials and the reasons behind them without being prompted.

On the beachfront home we're managing in Negril, the brief was a house that feels relaxed and Jamaican and holds up to salt air. That shaped choices like bronze aluminum windows and doors, and Meranti Batu wood doors for the bedrooms and baths. The windows have been inspired by traditional Jamaican wood louvres, so the afternoon light falls in soft stripes across the floor.

That's the kind of detail to listen for. It tells you someone has thought about how your home will look and how it will hold up on the island.

A good answer sounds like: named materials, the reason for each one, and photos from a real Jamaica project.


7. When will you actually need me on the island?

Nobody can honestly promise you'll never fly down, and you probably don't want that. Some decisions are better made in the room.

The owners of that 10,000-square-foot beachfront home in Negril live in the US full time. Over two years of building, they've flown down at least five times, for the decisions that needed them there. We handled everything in between.

Ask which decisions will need you in person, and ask early. Then you can plan those trips around your work, instead of booking a flight because something went sideways.

A good answer sounds like: a short list of decisions that need you in person, planned ahead.


How to use these questions when you're building a home in Jamaica

Bring this list to every first conversation, and write down what you hear. You're listening for names, schedules, and examples from real projects. Answers like those are easy to compare side by side, and they'll tell you who has done this before.

If you're building a home in Jamaica from the US, in Negril, Montego Bay, or anywhere in between, I'd be glad to answer all seven for your project. You don't have to manage this. That's my job.


Discovery calls are open. Book yours here and we'll walk through how oversight would work for your build.

 
 
 